This Dry Room project was made in the US,which was included the Dehumidifier and Water Coolling machine for dry room; Infrastructure including the Color steel plate, dust remove in air shower room, water pipe, blast pipe, PVC floor, LED lighting,etc.AME arranged the professional engineers team to make the on-site installation,and provided one year warranty of quality.